TitleProduct

Cold Drawn Seamless Tube 20Cr 40Cr

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2023-11-10 15:52

  • Browse the number:

    373

Send an inquiries

Company Profile

Zhejiang Dingxin Steel Tube Manufacturing Co.,Ltd

By certification [File Integrity]

Contact:dingxin888(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website:http://www.dingxinsteeltube.com/ http://dingxin888.sxlleather.com/

PRODUCT DETAILS

20Cr and 40Cr are alloy steels which are commonly used by automotive industry. Dingxin Steel Tube has around 20 years for the producing of alloy steel tubes and gained considerable experience for the heat treatment such as stress relief, quenched and tempered, etc.

 

Product Details

 

Product name

Cold drawn seamless tube 20Cr 40Cr

Standard

GB/T 3077 Alloy structure steels

Material

20Cr 40Cr

Dimension

OD: 16-245mm, WT1-32mm, Length: 3-6m or based on clients’ request

Delivery condition

Stress relieved, Normalized, Annealed, Quenched and tempered

Certificate

ISO 9001, IATF 16949

Applications

Automotive industry such as bushing, tie rod, tension pulley, drag link, stabilizer link, torque rod, etc.

Packaging

Long pipe: hexagonal bundles with steel-hooped.

Short cut pipes: wooden box or metal frame

 

Chemical Composition

 

Steel Grade

C

Si

Mn

Cr

Mo

20Cr

0.18-0.24

0.17-0.37

0.50-0.80

0.70-1.00

 

40Cr

0.37-0.44

0.17-0.37

0.50-0.80

0.80-1.10

 

 

Mechanical Properties For Quenched And Tempered

 

Material

Tensile strength (Mpa)

Yield strength
(Mpa)

Elongation
(%)

No less than

20Cr

835

540

10%

40Cr

980

785

9%

 

FAQ

 

1. Q: Are you a trading company or manufacturer?

      A: Dingxin is a profession steel tube manufacturer locating in Jiaxing City, Zhejiang Province.

 

2. Q: How long is your delivery time?

      A: Dingxin manufacture the seamless tube 20Cr or 40Cr according to client’s specified requirement. It takes 30-40 days to produce the pipes after reaching agreement with clients.

 

3. Q: What is your term of payment?

      A: 30% deposit after contract signed, 70% balance against B/L copy. Or Letter of credit at sight.

 

http://www.dingxinsteeltube.com/